Two structurally connected buildings, different property owners and strict conservation requirements: the renovation of Wagenbachgasse 3 posed a particular challenge to everyone involved. Livit’s construction management team took charge of the project and construction management, coordinated the various stakeholder groups and successfully upgraded the historic building from 1768 to make it fit for the future.

September 2026

Year of construction1768
ClientInstitutional
ArchitectLivit AG
LocationLucerne
Construction period2025
  • Building condition analysis
  • Planning
  • Construction Management/Project Management

More than just a façade facelift

Behind the new look lies an extensive renovation. The existing roof structure was upgraded, damaged rafters were replaced or repaired, and the roof – including insulation and tiling – was rebuilt. At the same time, work was carried out on the façade, plumbing and timber to preserve the structure for the long term.

A particular challenge was reconciling technical requirements with building conservation regulations. All work on the pitched roof had to be approved by the authority responsible for the preservation of monuments and historic buildings; at the same time, a colour concept had to be developed that respected the historic character of the building and took account of its unique situation as part of an «uneven pair».

A new colour scheme with historical references

The colour scheme was created in collaboration with a colour consultant and was based on previous restoration-related colour analyses. The concept was closely coordinated with the authority responsible for the preservation of monuments and historic buildings.

The result is a subtle colour scheme with soft shades of green and apricot. It draws on elements of the striking neighbouring façade, but reinterprets them in a much more understated way. This gives Wagenbachgasse 3 its own identity while maintaining a design connection to the adjoining section of the building.

Precise coordination right through to completion

In addition to the building conservation requirements, the limited space in the old town and the fact that the building was fully let also posed significant challenges for the project’s implementation. For Livit’s construction management team, this meant carefully aligning the interests of the property owners, tenants, authorities and specialist planners.

Thanks to forward planning and the close cooperation between all those involved, we were able to adhere to both the timeframe and budget. The result is impressive not only in terms of design, but also in the execution and the sustainability of the renovation. The feedback from the property owners has been correspondingly positive.

Preserving history, shaping the future

This unique renovation demonstrates how Livit can successfully deliver even the most challenging construction projects in listed buildings – safely, efficiently and with due regard for all stakeholders. The result is a building that visibly preserves its history while also being fit for the future.
 